loading

Trusted Trailer Parts Manufacturer and Supplier Since 2003

The use of heavy truck series axle and maintenance

New axle ( Hydraulic trailer axle, dynamic platform car axle, tyred handling locomotive bridge) Before using, from oil hole to refill GL5EP80W - within the main reducer 90 ( Used for the temperature is not lower than - 26℃) Or GL5EP85W - 140 ( Used for the temperature is not lower than - 12℃) Heavy duty gear oil; Before use, to each nozzle filling plenty of 2 # lithium grease. After use, the vehicle must pass a 1500 km running-in, after review fasteners, before officially put into use. Low oil change period: 2000 - 4000 km after replacing assembly into the lubricating oil, every 5000 km or check the oil level once a month; Every 15000 Km or replacement of a lubricating oil every year; Every 15000 Km or change once a year brake adjusting arm, and CAM shaft of grease. Relevant tags: steering axle

GET IN TOUCH WITH Us
recommended articles
200 FAQ INFO CENTER
no data

As a rapidly developing trailer parts provider, our company now covers an area of 20,000 square meters, and has more than 150 employees.

contact us

Contact Person: Mr. Huawei Wang
Tel: +86-13356687529 / +86- 15753112927
 / +86-13280015673
E-mail: whw@sdfhcheqiao.com
Fax: +86-531-83828182
Address: Nanwang Industrial Park, Xianggong Town, Zhangqiu City, Shandong Province, China 
Copyright © 2025 Shandong Fuhua Axle Co., Ltd. | All Rights Reserved | Sitemap
Contact us
wechat
whatsapp
Contact customer service
Contact us
wechat
whatsapp
cancel
Customer service
detect